Categories
NEW and UNUSED 6,000 BPD Crude Oil Distillation Un
US$14,250,000.00 per Unit
Minimum 1 Unit per order.
(1 available in United states)
Product Information
Payment:
Bank Draft
Delivery:
10 Sep, immediate from today upon confirmation.
EXW (Ex Works)
Listed on:
20 Sep 2011
268
SKU:
Petroleum Refinery
Product ID:
1917691
Additional Info:
When you have identified a potential buyer for this "mini-refinery" it would in your best interests to invite them to come to visit our fabrication facility. We invite the client to visit our facility at any time and look at the equipment.

All the materials that went into this unit were produced in the USA.

This price does not include the add-on component the Hydrotreater to produce the various grades of gasoline from the full range naphtha.

An exact price will be provided once the client has made a formal request for price quote for the gasoline component. Also we have a special arrangement with the platinum suppler that we average the price over a several month period if in fact the price of the platinum should rise or fall. But we also give the client the option to decide if they belief that the price of platinum will rise or fall they can pay up front for the material.

This 6000 barrel per day (bbls/d) crude oil distillation unit refinery "topping plant" is currently inventoried in our yard.
It is a complete unit with all supporting utilities to produce four refined petroleum products.

The unit is priced without a power generator however we have several power generators that we can offer.

This mini-refinery produces four refined products, (1) NAPHTHA, (2) KEROSENE, (3) DIESEL, (4) RESIDUAL FUEL OIL.

Note: The existing refinery can be operated as is and the gasoline producing component can be installed without interrupting the daily operation of the "topping plant" until it is ready to be moved in place and flanged bolted to the main unit.

Due to the fluctuating price of platinum the principal catalyst in this component that converts NAPHTHA to GASOLINE we can only provide a estimated price for this component at this time.

This "topping plant refinery" is capable of being operational with in 4 to 6 weeks of arrival on site assuming that that the site of operation has been prepared and all materials that are necessary to complete.

Buyers' Review
See All Reviews

Similar Products From This Seller

Similar Products From Other Sellers

Similar categories you might be interested

Ask for Quotation
Order Quantity
Unit
Additional Information
Your Company Information
Email Address
Re-Enter Email Address
Company Name
Your Name
Country
ADVERTISEMENT